01Manufacturing Engineering Software

Stop guessing at capacity.
Start engineering it.

Three purpose-built tools for the plant floor — constraint analysis, labor standards, and capacity planning. Built by manufacturing engineers who got tired of doing this in Excel.

Constraint Analysis Model — models_db.json
File
Edit
View
Reports
Help
Process ID:
Main Line
NUMBER
OF DAYS
1.00
SCHED.
HRS / DAY
8.17
TOTAL
THROUGHPUT
257 pcs
THROUGHPUT
/ HOUR
31 pcs/hr
OPERATORS
REQUIRED
24.00
INDIRECT
LABOR
0.00
TOTAL
THRUPUT
3,284
BOTTLE-
NECK
Operation
# 10
THROUGHPUT CHART
500 400 300 200 100 257 10 257 20 257 30 257 40 257 50 257 60 257 70 257 80 257 90 257 100 257 110 257 120 257 130 257 140 257 150 257 160 257 170 257 180 257 190 257 200 257 210 257 220
throughput
scrap
rework
inefficiency
availcapacity
setups
PROCESS CONDITIONS
Num Operation Equip
Avail
Operators/
Equip
Pcs/
Cycle
Cycle Time
(sec/pc)
Avail
(h/d)
1 10 A1 - INITIAL FRAME ASSEMBLY 1.00 1.00 1.00 108.77 8.17
2 20 A2 - MODULE INSTALLATION 1.00 1.00 1.00 71.80 8.17
3 30 A3 - FASTEN MODULE TO FRAME 1.00 1.00 1.00 85.91 8.17
4 40 A4 - WIRE HARNESS ROUTING 1.00 1.00 1.00 72.09 8.17
5 50 A5 - DRIVE UNIT ASSEMBLY 1.00 1.00 1.00 93.23 8.17
6 60 A6 - CONNECT VALVE, PUMP & SENSOR 1.00 1.00 1.00 88.14 8.17
7 70 A7 - INSTALL TEMPERATURE SENSOR 1.00 1.00 1.00 71.01 8.17
8 80 A8 - PANEL CALIBRATION 1.00 1.00 1.00 75.15 8.17
9 90 A9 - CONNECTOR CRIMPING 1.00 1.00 1.00 75.26 8.17
DATABASE
MODEL
Bottleneck Detected
Op #10 · 108.77 s cycle time
Total Throughput
3,284

Illustrative data — not an actual customer model

02Our Products

One team, three tools for the plant floor

Each product stands on its own. Use one, or run all three on the same data.

01 / CAM
Live

Constraints Analysis Model

Find your production bottleneck, simulate improvements, and increase throughput — in minutes, not weeks.

Explore CAM
02 / TMU
Live

Simplify TMU Software

Replace the manual Excel labor-standard calculation with a dedicated tool for TMUs, routing, and factors.

Explore TMU Software
03 / CPM
Coming Soon

Capacity Planning Model

Plan, simulate, and optimize your entire production capacity — before committing a single resource.

Get notified
03Who We Are

Manufacturing engineering software, built by engineers

Simplify Capacity is the software arm of López Arechiga e Hijos. We build the tools we wished we had on the plant floor — so engineering teams spend their time on decisions, not spreadsheets.

Every product ships with a real licensing system, a support team that answers, and a roadmap driven by what manufacturers actually ask for.

01
Built for the plant floor
Not adapted from generic BI tools — designed around how manufacturing engineers actually work.
02
Fast to value
From install to your first real insight in under an hour.
03
A team that answers
Direct support from the people who build the software — no ticket queues.
04Get In Touch

Tell us what
you're trying to solve.

Whether it's a bottleneck, a labor standard, or a capacity plan — we'll point you to the right product and get you set up.

Contact Us